CloudLink V1.0 - V1.3 Wiring Diagram
CloudLink
Input Power
- The CloudBox can run off either AC or DC. Move the AC/DC switch before connecting wires.
- Position 1 requires power for the board to operate.
- Input Power requires 100-240VAC 50/60 Hz or 8-14VDC
- AC: Load, Neutral, Ground
- DC: Positive, Negative
Output Power
- Output Power to a pump, solenoid, or dispenser is connected to the bottom left terminal labeled PUMP.
- AC: Load, Neutral, Ground
- DC: Positive, Negative
Pulse Input
- PWR = 12VDC
- ENC FILL = Pulse wire
- GND = Pulse wire
RS-485
- RS-485 connection used between the CloudBox and CloudLink.
#
/hc/theming_assets/01HZKMYN8E7Y938GQTJ0D5MY4Q
FAQ
Questions about Lotus Themes products and services
custom
#
/hc/theming_assets/01HZKMYNC3XW482R7CGC4ZKXD9
Guides
Instructions related to themes installation and usage
community
/hc/en-us/community/topics
/hc/theming_assets/01HZKMYNG9A5MHNNT0QG7H0CGC
Community
Join discussions with other users
Installation, Account Setup, Reports
Comments
Article is closed for comments.